This paper introduced the actual topography and geological conditions of an electrolytic plant ground,in view of existing problems in engineering,discussed the measures of large area back filled region ground with dynamic compaction method in foundation treatment,and summa-rized the matters needing attention in ground pile foundation design after consolidation,ensured the construction quality of entire engineering.%介绍了某电解厂区场地实际地形地貌及地质条件,针对工程中存在的问题,论述了大面积回填区场地采用强夯法进行地基处理的措施,并总结了强夯加固后场地桩基础设计中的注意事项,保证了整个工程的施工质量。
展开▼