Introduced the air conditioning chilled water system , the choice of water chiller and end equipment in this project, has analyzed in the design due to the limit of construction condition , resulting in overpressure of air conditioning system , the correct choice device meets the design pressure request.In the application of chilled water large temperature difference , although reduced the freezing water volume , to reduce the energy consumption of pumps, but has had the influence to the end equipment , took the corresponding measures to meet the design varia-ble request of end equipment.%介绍了本项目的空调冷水系统、空调主机和末端设备的选择,分析了在设计中由于建筑条件的限制,产生了空调系统的超压,正确选择设备满足设计压力要求。在冷水大温差的应用中,虽然减少了冷冻水量,降低水泵能耗,但对末端设备产生了影响,采取相应措施满足末端设备的设计参数要求。