首页> 中文期刊> 《武汉大学学报:自然科学英文版》 >Transverse Joint Aperture Simulation of High Arch Dam Based on Measured Temperature in Construction Period

Transverse Joint Aperture Simulation of High Arch Dam Based on Measured Temperature in Construction Period

         

摘要

Transverse joint aperture is of certain reference value to ensure joint grouting quality and overall safety of high arch dam. A 3D isoparametric joint element model with spherical surface key grooves and finite thickness is used to simulate a transverse joint. A set of program is developed to simulate the transverse joint aperture of Dagangshan high arch dam. Combined with the measured temperatures, the whole developing process of Dagangshan arch dam's transverse joint aperture is simulated. The real work behavior of transverse joint, thermal and mechanical properties of concrete, pouring process, joint grouting temperature and cantilever height of high arch dam are considered during the simulation. The simulation results show that the lower of the joint grouting temperature, the larger value of transverse joint aperture; the higher of cantilever height during the construction period, the smaller value of transverse joint aperture.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号