首页> 中文期刊> 《西南交通大学学报》 >人工结构体控制堰塞湖溃决洪峰的试验与设计

人工结构体控制堰塞湖溃决洪峰的试验与设计

         

摘要

In order to verify the control effect of different artificial structures in dealing with barrier dam-break floods, flume model tests were conducted in lab on tetrahedral entity structure (TES), tetrahedral entity structure group ( TESG) , tetrahedral frame structure ( TFS) and tetrahedral frame structure group (TFSG). The research results show that throwing artificial structures has an important effect on the control of barrier dam-break floods, and compared with no throwing artificial structures, throwing artificial structures can effectively reduce the peak break-out floods by 26. 6% to 61. 7%. Different artificial structures have different control effects, and optimal structures are in sequence TFSG, TESG, TFS and TES. In addition, increasing unit weight of artificial structures can improve the control effect.%为检验人工结构体对堰塞湖溃决洪峰流量的调控作用,进行了室内水槽模型试验.试验主要针对四面体实体结构、四面体实体结构串、四面体实心框架结构和四面体实心框架结构串.试验结果表明:抛投人工结构体对堰塞湖溃决后期洪峰流量的控制作用非常显著,与未抛投人工结构体相比,4组抛投人工结构体的洪峰流量减小26.6%~61.7%;人工结构体的优选型式依次为四面体实心框架结构串、四面体实体结构串、四面体实心框架结构和四面体实体结构;增大人工结构体的容重能改善堰塞湖溃决洪峰流量的调控效果.

著录项

  • 来源
    《西南交通大学学报》 |2011年第2期|228-234|共7页
  • 作者单位

    中国科学院山地灾害与地表过程重点实验室,四川,成都610041;

    中国科学院水利部成都山地灾害与环境研究所,四川,成都610041;

    中国科学院山地灾害与地表过程重点实验室,四川,成都610041;

    中国科学院水利部成都山地灾害与环境研究所,四川,成都610041;

    中国科学院山地灾害与地表过程重点实验室,四川,成都610041;

    中国科学院水利部成都山地灾害与环境研究所,四川,成都610041;

    西南交通大学土木工程学院,四川,成都610031;

    中国科学院山地灾害与地表过程重点实验室,四川,成都610041;

    中国科学院水利部成都山地灾害与环境研究所,四川,成都610041;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TV122.4;
  • 关键词

    堰塞湖; 溃决; 人工结构体; 流量调控;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号