首页> 中文期刊> 《建筑经济》 >基于KanBIM的施工质量控制活性系统模型构建研究

基于KanBIM的施工质量控制活性系统模型构建研究

         

摘要

Currently,research on the application of KanBIM technology in construction site quality control only starts from the perspective of the concept and components of KanBIM,as well as the informationization of construction quality,rarely considers the organizational coordination control. In this paper,introduces the active system,based on the recursive features of LPS in KanBIM,considers the relations between organizations and organizational environments,as well as the balance and autonomy between construction quality plans of the same level and that of different levels,etc,constructs the active system model of construction quality control which is based on KanBIM from the perspective of mastering plan,stage plan,prospective plan,weekly plan and daily plan,so as to control the construction on-site quality more systematically,comprehensively and perfectly.%目前KanBIM技术在施工现场质量控制中的应用研究仅仅从KanBIM概念、组成以及施工质量信息化角度出发,很少考虑组织上的协调控制,从而不能实现精益施工过程。为此引入活性系统,基于KanBIM中LPS的递归特点,考虑组织与组织环境的关系,以及同级施工质量计划与不同级施工质量计划之间的平衡与自治等问题,从主控计划、阶段计划、前瞻计划,周计划、日计划角度构建基于KanBIM的施工质量控制活性系统模型,更加系统、全面、完善地进行施工现场质量控制。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号