In this paper, the scene of mixed manufacturing/remanufacturing is studied, and the mixed lot-sizing model with remanufacturing and capacitated inventory capacity is built. According to the characteristic of problematical model, a heuristic ant colonies algorithm is designed to find the solution. Simulation experiment on the proposed algorithm is carried out for attesting the validity and efficiency of the algorithm, and the parameter value selection issues are discussed as well.%研究企业制造/再制造的混合生产场景,建立含再制造的库存能力受限的混合批量模型;根据问题模型的特性设计启发式蚁群算法进行求解;通过对提出的算法进行仿真实验,以验证所提算法的有效性和效率,并对参数值的选择问题做了一些探讨.
展开▼