首页> 中文期刊> 《中国有色金属学报:英文版》 >Bio-leaching of low-grade large porphyry chalcopyrite-containing ore

Bio-leaching of low-grade large porphyry chalcopyrite-containing ore

         

摘要

In order to economically recover the copper from the low grade copper ores, a bioleaching solvent extraction electrowinning plant with a design capacity of 2 000 t cathode copper per year in Dexing Copper Mine was operated in September, 1997. The results during the 10 month period of the industrial copper dump leaching have been obtained and the approaches have been carried out to enhance the copper dissolution from the waste rocks. The overall operation flowsheet is depicted. The problems confronted in the process and possible way for improving are discussed.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号