结合天津地铁3、6号线换乘站北站工程,通过明确合理的技术措施、科学的施工管理、优化关键节点、现场实时监测等措施,确保已运营的3号线车站安全,换乘车站运营车辆正常通行,换乘站施工安全,为今后施工类似换乘站积累了可借鉴的经验。%According to Tianjin metro line 3 and line 6 transfer station Beizhan station engineering, through specific and reasonable technical measures , scientific construction management , optimized key nodes , on- site real- time monitoring measures, we ensured the metro station safety of the existing metro line 3, the normal traffic interchange station operating vehicles, and the transfer station construction safety. This paper can provide experience for the future similar transfer station construction.
展开▼