Improving Cost and Schedule Performance on Large Energy Infrastructure Deployment Projects: Establishment of Best Practices for Risk Management and Organizational Learning based on Nuclear Power Generation Project Assessments.

机译:改善大型能源基础设施部署项目的成本和进度绩效:基于核电项目评估建立风险管理和组织学习的最佳实践。

获取原文
获取原文并翻译 | 示例

摘要

Improving the cost of energy generation projects is an objective of the various stakeholders partaking in the development and procurement of energy generation infrastructure. These projects have historically suffered from significant cost and schedule overruns, which are often caused by externalities or risks that are inadequately assessed prior to the project start, and hence ineffectively managed over the course of the project. This study uses nuclear power generation as a test-case to assess the causes of these externalities, and to develop potential improvements. The nuclear power industry has historically been plagued with considerable power plant deployment risks; project cost and schedule overruns present a significant risk to investors. The drivers to nuclear-power deployment risks over other technologies include the high cost of knowledge-workers in the nuclear field, the high cost of technology development, the highly specialized quality assurance process and the high level of regulation in the industry. All of these risk drivers are anticipated to continue to be significant issues, and with the recent events at the Fukushima Daiichi nuclear plant, the regulatory landscape is even more uncertain for nuclear power deployment. The nuclear industry has responded by employing risk management practices to reduce the uncertainty associated with nuclear power plant deployment. Although these risk management practices have been put in place, considerable cost and schedule excursions have continued to occur in the construction of recent nuclear power plant projects.;This paper proposes to improve risk management by identifying limitations within the existing standards of practice related to risk identification, assessment and organizational learning. For risk identification and assessment, a standard risk register and objective-driven methods are proposed. For organizational learning, a method of measuring learning relative to risk management is proposed, and a framework for institutional learning across the nuclear industry was proposed, and is presently being implemented.
机译:提高能源发电项目的成本是各种利益相关者参与能源发电基础设施的开发和采购的目标。这些项目历来遭受重大的成本和进度超支,这通常是由外部性或风险引起的,这些外部性或风险在项目开始之前未得到充分评估,因此在项目过程中进行了无效管理。这项研究使用核能发电作为测试案例,以评估这些外部性的原因并开发潜在的改进措施。历史上,核电行业一直遭受着巨大的电厂部署风险。项目成本和进度超支给投资者带来重大风险。与其他技术相比,导致核电部署风险的驱动因素包括核领域知识工作者的高昂费用,技术开发的高昂费用,高度专业化的质量保证流程以及行业中的高水平监管。预计所有这些风险驱动因素将继续成为重大问题,并且随着福岛第一核电站的近期事件,监管前景对于核电的部署更加不确定。核工业已通过采用风险管理实践来减少与核电厂部署相关的不确定性,以做出回应。尽管已经采取了这些风险管理措施,但是在最近的核电站项目的建设中仍然发生了相当多的成本和进度偏移。;本文提出了通过在现有的与风险相关的实践标准内确定局限性来改善风险管理的建议识别,评估和组织学习。为了进行风险识别和评估,提出了标准的风险登记册和目标驱动的方法。对于组织学习,提出了一种测量与风险管理相关的学习的方法,并提出了整个核工业的制度学习框架,目前正在实施中。

著录项

  • 作者

    Talabi, Sola M.;

  • 作者单位

    Carnegie Mellon University.;

  • 授予单位 Carnegie Mellon University.;
  • 学科 Engineering.;Operations research.
  • 学位 Ph.D.
  • 年度 2013
  • 页码 219 p.
  • 总页数 219
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号