声明
Abbreviations
1 Introduction
1.1 Background of study
1.2 Statement of the Problem
1.3 Objectives of the study
1.3.1 General objectives
1.3.2 Specific objectives
1.4 Research questions
1.5 Scope of Study
1.6 Methodology
1.7 Significance of study
1.8 Limitation of study
1.9 Layout of Dissertation
2 Literature Review
2.1 Definition of Material Management
2.2 Material management in construction project
2.3 Process of Material Management
2.4 Objective of Material Management in construction project
2.5 Material Management Functions
2.5.1. Planning
2.5.2 Ordering
2.5.3 Purchasing and Procurement
2.5.4 Receiving
2.5.5 Inspection
2.5.6 Storage control
2.5.7 Issuing materials and distribution
2.6 Root causes of ineffective material management
2.6.1 During materials selection
2.6.2 During vender selection
2.6.3 Procurement and Purchasing
2.6.4 Construction phase.
2.7 Consequences of ineffective material management on project delivery
2.8 Advantages of construction materials management
2.8.1 Systematic operations
2.8.2 Reduction in cost
2.8.3 Increase in productivity of the labors
2.8.4 Time management
2.8.5 Quality control
2.8.6 Better relations with suppliers and customers
2.9 Summary
3. Methodology
3.1 Introduction
3.2 Research design
3.2.1 Characteristics of Good Research Design
3.2.2 Questionnaire survey
3.2 Questionnaires Design
3.3 Population and population size
3.4 Summary
4. Data Collection and Analysis
4.1 Introduction
4.2 Data collection
4.2.1Primary data collection
4.2.2 secondary data collection
4.3 Respondent Profile and Grade of the Company of the Respondent
4.4 Data Analysis
4.5 summary
5. Conclusions and Recommendations
5.1 Conclusion
5.2 Recommendation
5.3 Recommendation for further study
参考文献
Appendix
致谢
湖南大学;