首页> 中文学位 >Design and Optimization of Surface Mine Case Study:Hebei Limestone Mine
【6h】

Design and Optimization of Surface Mine Case Study:Hebei Limestone Mine

代理获取

目录

封面

声明

DEDICATION

致谢

中文摘要

英文摘要

目录

LIST OF ABBREVIATIONS

Chapter I INTRODUCTION

1.1 Background

1.2 Statement of the problem

1.3 Significance of project

1.4 Scope of work

1.5 Objective of project

Chapter II LITERATURE REVIEW

Chapter III OVERVIEW OF THE MINE

3.1 OVERVIEW OF THE MINE

3.2 Orebody characteristics

3.3 Nature of ore types and characteristics

3.4 The reserve estimate used in the industrial index

3.5 Open-pit mining boundary

3.6 Stripping Ratios

3.7 Principles for determining open-pit mining boundary

CHAPTER IV DESIGN OF THE OPEN-PIT MINE

4.1 Design Overview:

4.2. Database

4.3. Sectioning and Digitizing

4.4 Triangulation

4.5 Compositing

4.6. Block Modelling

4.7 Inverse Distance

4.8 Pit design

Chapter V OPTMIZATION

5.1 Optimization Algorithms

5.2 The Optimization of the Hebei mine using Whittle

5.3 Optimization in Whittle

5.4 Design of the optimized pit in Surpac

5.5 Calculation of stripping ratio of an optimized pit

CHAPTER VI DISCUSSION AND CONCLUSION

6.1 DISCUSSION

6.2 RESULTS

6.3 CONCLUSION

6.3 RECOMMENDATIONS

参考文献

展开▼

摘要

本研究仅限于河北省石灰石露天矿的设计和优化。由于露天矿的优化具有积极的贡献,为了更好地理解参数,方法和算法来调节,确保最低的生产成本,本研究的主要目的是设计,优化和对比研究优化的露天矿和未优化的露天矿的区别。
  为了达到研究的目的,本文用了定量和定性的方法,做了一项关于河北石灰石矿的调查并收集了数据,并使用这些数据创建了 SURPAC数据库。对钻孔进行了处理和切分创建了一个复合文件。通过划定主矿体,创建了一块模型坑。这块矿井后来被设定了许多约束和变量。第一个矿井被设计为未优化的矿井,它的数据被输入到WHITTLE软件进行优化。优化所需的其他参数还有:输入到 WHITTLE创建了两个 WHITTLE需要的主要文件(mod文件和 par文件),矿石的价格包括成本价格和销售价格,使用世界地理坐标系在AUTOCAD上绘出地势----因为 SURPAC用的就是这个坐标系,之后地势参数被输入到WHITTLE,一个字符串文件和 dtm文件就建成了。然后这些文件被输入 WHITTLE进行优化,之后再输入SURPAC进行最终的设计优化。最后,对从优化矿井和未优化矿井得到的结果进行对比和分析。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号