首页> 外文会议>WEFTEC 2011;Annual Water Environment Federation technical exhibition and conference >Orange County’s Groundwater Replenishment System: Water Quality Monitoring and Facility Expansion in the Face of Changing Regulations
【24h】

Orange County’s Groundwater Replenishment System: Water Quality Monitoring and Facility Expansion in the Face of Changing Regulations

机译:橙县的地下水补给系统:面对不断变化的法规,水质监测和设施扩建

获取原文

摘要

The Groundwater Replenishment System (GWRS) is a 70 MGD indirect potable reuseproject located in Fountain Valley, California. Two ongoing state regulatory processeshave the potential to influence operations and water quality monitoring for GWRS andother groundwater recharge reuse projects (GRRPs) in California. The first is the effortby the State Water Resources Control Board (SWRCB), in collaboration with theCalifornia Department of Public Health (CDPH), to establish monitoring requirementsfor constituents of emerging concern (CECs), such as pharmaceuticals and personal careproducts (PPCPs) and endocrine disrupting compounds (EDCs), for GRRPs. The secondprocess is the legislative mandate for formal adoption of the CDPH Draft GroundwaterRecharge Reuse Regulations (Draft Regulations) by December 2013. OCWD’s currenttreatment processes and monitoring programs should address most, if not all, of theimmediately forthcoming CEC testing requirements. However, potential changes torequirements for subsurface retention time, blending, and unit process monitoring wouldimpact future GWRS operations and uses.
机译:地下水补充系统(GWRS)是位于加利福尼亚州芳泉谷的70 MGD间接饮用水再利用项目。正在进行中的两个州监管程序有可能影响GWRS和加利福尼亚其他地下水补给再利用项目(GRRP)的运营和水质监测。首先是国家水资源控制委员会(SWRCB)与加利福尼亚公共卫生部(CDPH)合作,为新兴关注的成分(CEC)(例如药品和个人护理产品(PPCP)和内分泌)建立监测要求用于GRRP的破坏性化合物(EDC)。第二个过程是在2013年12月之前正式通过CDPH地下水再利用条例草案(条例草案)的立法任务。OCWD的当前处理程序和监视计划应解决(即使不是全部)大多数即将发布的CEC测试要求。但是,对地下保留时间,混合和单元过程监控的要求可能会发生变化,这将影响未来的GWRS操作和使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号