首页> 外文会议>WEFTEC 2011;Annual Water Environment Federation technical exhibition and conference >Emergency Response Leads to Fast Track Critical Infrastructure Rehabilitation
【24h】

Emergency Response Leads to Fast Track Critical Infrastructure Rehabilitation

机译:紧急响应导致对关键基础设施的快速修复

获取原文

摘要

Emergency response and effective sewer rehabilitation are not terms that are usually discussedtogether. The City of Sioux Falls, South Dakota, experienced such an event during record settingrainfall. A critical sewer collapsed that required the City to respond to prevent a serious sewagebackup. The bypass pumping system to address the immediate sanitary sewer overflows werethen immediately implemented into the selected rehabilitation alternative. Evaluation,constructability, and planning of the rehabilitation were all completed within one week of theevent. The result was a project completed cost-effectively in a 6 week period that minimizedimpacts to the citizens of Sioux Falls. The emergency response, evaluation of alternatives,construction methods and project results are presented in this paper.
机译:应急响应和有效的下水道修复不是通常一起讨论的术语。南达科他州苏福尔斯市在创纪录的降雨中经历了这样的事件。严重的下水道倒塌,要求纽约市做出反应以防止严重的污水排放。然后,解决了立即出现的污水管道溢流问题的旁路泵送系统立即被实施为选定的修复方案。活动的一周内完成了评估,可建设性和康复计划。结果是在6周内经济高效地完成了项目,从而最大程度地降低了对苏福尔斯(Sioux Falls)居民的影响。本文介绍了应急响应,替代方案评估,施工方法和项目成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号