【24h】

Improving the Naval Construction Process Through Lean Implementation

机译:通过精益实施改善海军建设过程

获取原文
获取原文并翻译 | 示例

摘要

This study uses systems dynamics modeling to analyze the United States Navy's current construction administration process from design to implementation in order to recommend process improvements, which will prevent cost overruns, delays, and ultimately a waste of tax payers' resources. This study specifically examines the impact of upstream design implementations on the entire system, and incorporates a number of lean thinking ideas. It demonstrates the positive effects of increased constructability efforts and design sharing among engineers, and indicates that when limited resources exist it is best to focus constructability and design sharing efforts as early as possible during the upstream process. Finally, this paper concludes with a number of recommendations for how the United States Navy's Civil Engineer Corps and possibly Seabee Construction Battalions can best implement these ideas.
机译:这项研究使用系统动力学建模来分析美国海军从设计到实施的当前施工管理流程,以提出流程改进建议,以防止成本超支,延误并最终浪费纳税人的资源。这项研究专门研究了上游设计实施对整个系统的影响,并结合了许多精益思想。它展示了增加可构造性工作和工程师之间的设计共享的积极效果,并指出当资源有限时,最好在上游过程中尽早集中精力进行可构造性和设计共享工作。最后,本文最后提出了一些建议,说明美国海军的土木工程师团以及可能的Seabee建设营如何才能最好地实施这些想法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号