首页> 外文会议>Structural Engineering and Public Safety >Planning and Implementation of a Seismic Monitoring System for the Bill Emerson Memorial Bridge in Cape Girardeau, MO
【24h】

Planning and Implementation of a Seismic Monitoring System for the Bill Emerson Memorial Bridge in Cape Girardeau, MO

机译:密苏里州吉拉多角比尔·爱默生纪念大桥地震监测系统的规划和实施

获取原文
获取原文并翻译 | 示例

摘要

A multi-agency partnership was formed to plan, design, install and maintain a seismic instrumentation system on the Bill Emerson Memorial Bridge in Cape Girardeau, Missouri. From start to finish the project took almost nine years. Cooperation among the various agencies was key to the successful completion of the project. Real-time data from the instrumentation system is available to the public through the IRIS website.
机译:在密苏里州开普吉拉多的比尔·爱默生纪念桥上,建立了一个多机构合作伙伴关系,以计划,设计,安装和维护地震仪器系统。从开始到结束,该项目花费了将近9年的时间。各个机构之间的合作是成功完成该项目的关键。仪器系统的实时数据可通过IRIS网站向公众公开。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号