首页> 外文会议>Proceedings of international symposium on rock mechanics and mine dynamic disaster prevention >Analysis on Interference Force to Large Coal Particle Transport in the Pipelines
【24h】

Analysis on Interference Force to Large Coal Particle Transport in the Pipelines

机译:管道中大颗粒煤运移的干扰力分析

获取原文
获取原文并翻译 | 示例

摘要

Slurry is belonging to the state of suspension of heterogeneous flow when transporting large coal particle in inclined pipeline.The large coal particles in inclined pipeline are not only recruited to the drag giving by carrying fluid but also the interference force from other particle.In order to study on interference force to large coal particle in the pipeline,to be use of already theory and experimental data to study,and discover The traditional force balance equation can not satisfy the stress of the large coal particle.So conjecture it may be has many unknown resistance in inclined pipeline.Base on the research,we can get the raise interference force coefficient Kc by using data fitting to revise traditional force balance equation.
机译:煤泥属于在倾斜管道中运输大煤颗粒时的非均质悬浮状态,倾斜管道中的大煤颗粒不仅被输送流体吸收到阻力中,还受到其他颗粒的干扰力。研究对管道中大煤粒的干扰力,利用已有的理论和实验数据进行研究,发现传统的力平衡方程不能满足大煤粒的应力。因此推测可能有许多未知数在此基础上,通过数据拟合修正传统的力平衡方程,可以得到提高的干扰力系数Kc。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号