The mining of open part has entered the end period in Yilan open pit mine,and plan to complete the mining of open part in 6 years.According to the requirements of coal production scale,production stripping and mining ratio,actual production capacity,design specification (Zhang,1987) factors,it has made the annual stripping and mining engineering position.But the problem not yet been settled was that the quantity and the corresponding location of stripping.This paper through computer simulation technology studys the dumping solution of the Yilan open pit mine based on the existing design.At the same time,it also simulated and calculated the annual average distance of dumping,the corresponding transportation cost.It formulated the practical dumping solution for Yilan open pit mine,and saved a lot of cost and resources.
机译:宜兰露天矿露天矿已进入末期,并计划在6年内完成露天矿的开采。根据煤炭生产规模,产量剥离和开采比例,实际生产能力,设计规范的要求(Zhang,1987)的因素,它已成为每年的剥采工程的位置。但是尚未解决的问题是剥的数量和相应的位置。本文通过计算机模拟技术研究了宜兰露天矿的倾倒解决方案。在现有设计的基础上,对年平均倾卸距离,相应的运输成本进行了仿真计算,为宜兰露天矿制定了实用的倾卸方案,节省了大量的成本和资源。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号