首页> 外文会议>ASME Energy Sustainability Conference >ENERGY POLICY AND SUSTAINABLILTY - A CASE STUDY APPLYING ENERGY MANAGEMENT CONTRACT IN CHINA
【24h】

ENERGY POLICY AND SUSTAINABLILTY - A CASE STUDY APPLYING ENERGY MANAGEMENT CONTRACT IN CHINA

机译:能源政策与可持续发展 - 以中国能源管理合同在中国案例研究

获取原文

摘要

This article states the energy policies, especially Energy Management Control (EMC), and relative measurements in recent ten years in China. In order to identify the effectiveness of these energy policies in the industrial sector in China, a project using EMC on a circulation cool water system was described as well as its energy-conserving results. The results indicated that the pump head was higher than what the system needed, namely electric energy would be wasted since the output of pumps cannot match pipe resistance pressure, also, based on the test data, the system water flow was larger than the design parameter, the main reason, besides the pump head, was that the pumps cannot be adjusted effectively so that technical personnel can only meet the needs through different combination pumps, nevertheless, by this method it was impossible to adjust water flow accurately. Furthermore, the water chilling units were influenced by scaling because of the quality of circulating water, thus their resistance pressure was increased greatly. Additionally, the cooling capacity of cooling tower was also decreased and some components need to be replaced. According to problem diagnosis, corresponding measures, such as changing pumps, adopting frequency control and water treatment, were performed, and annual power consumption was reduced from 1970000 kWh to 960000 kWh while annual power rate was reduced from 1190000 yuan to 580000 yuan. The results of the present work implied that EMC can accelerate the implementation of energy conservation projects, therefore, this system is quite feasible and its development is prospective in China.
机译:本文规定了中国近十年来的能源政策,特别是能源管理控制(EMC)和相对测量。为了确定中国工业部门在中国的这些能源政策的有效性,描述了在循环酷水系统上使用EMC的项目,以及其节能结果。结果表明,泵头高于所需的系统,即由于泵的输出不能匹配管电阻压力,即基于测试数据,泵头将被浪费,即,系统水流量大于设计参数,除泵头外,主要原因是泵不能有效调整泵,使得技术人员只能通过不同的组合泵满足需求,然而通过这种方法可以准确地调节水流。此外,由于循环水的质量,通过缩放的水冷装置受到缩放的影响,因此它们的阻力压力大大增加。另外,冷却塔的冷却能力也降低,需要更换一些组分。根据问题诊断,执行相应的措施,如改变泵,采用频率控制和水处理,从19700万千瓦瓦时减少了9600万千瓦时,虽然年的电力率从119万元降至580000元。目前工作的结果暗示,EMC可以加快节能项目的实施,因此,该系统是可行的,其发展在中国是潜在的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号