首页> 外文会议>International Conference on Engineering Research and Development >A Computer-Aided System for Job-Shop Flow Time and Due-Date Prediction
【24h】

A Computer-Aided System for Job-Shop Flow Time and Due-Date Prediction

机译:用于求职流程时间和截止日期预测的计算机辅助系统

获取原文

摘要

One of the key challenges confronting a production system is the accurate prediction of flow time (completion time) and due date of jobs coming into the job-shop. The inaccuracy in the determination of flow time and due date could lead to problems of dead line misses, high holding cost for waiting jobs and/or completed jobs, technical and cost inefficiency; and customer dissatisfaction, among others. In this paper, a Computer-Aided System which is based on an empirical model for predicting job-shop flow time and due-date was developed. The Computer- Aided System makes use of historical production data and other peculiar in-house factors of an organization. The Computer-Aided System was tested with real life job-shop data in order to test its efficiency and it was found to be efficient in predicting flow time and due date of jobs.
机译:面对生产系统的关键挑战之一是准确预测流量时间(完成时间)和进入工作商店的工作的截止日期。确定流量和截止日期的不准确可能导致死线未命中的问题,等待工作和/或完成工作,技术和成本低效率的高持有成本;以及客户不满,等等。在本文中,开发了一种基于用于预测作业商店流时间和截止日期的经验模型的计算机辅助系统。计算机辅助系统利用组织的历史生产数据和其他特殊的内部内部因素。计算机辅助系统用真实的工作店数据进行测试,以便测试其效率,并且发现它有效地预测流量时间和工作日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号