首页> 外文会议>TMS annual meeting exhibition;International symposium on high-temperature metallurgical processing >A PILOT-PLANT SCALE TEST OF COAL-BASED ROTARY KILN DIRECT REDUCTION OF LATERITE ORE FOR Fe-Ni PRODUCTION
【24h】

A PILOT-PLANT SCALE TEST OF COAL-BASED ROTARY KILN DIRECT REDUCTION OF LATERITE ORE FOR Fe-Ni PRODUCTION

机译:煤基回转窑直接还原铁镍生产中红土矿的中试规模试验

获取原文

摘要

Nickel pig iron (NPI), used as a substitute for electrolytic nickel, is able to reduce the production cost of stainless steel greatly. Aiming for preparing NPI from nickeliferous laterite ore, a pilot-plant scale test of coal-based rotary kiln direct reduction of laterite ore was performed and reported in this study. In this process, the ground laterite sample (18.85% TFe and 1.52% Ni) mixed with additives, pulverized coal and binder was briquetted into briquettes with the size of 40mm×40mm×31mm, laterite ore briquettes and reducing coal were charged into a rotary kiln with the diameter of 1.6 m and the length of 16 m, for a retention period of 6~7 hours, in which reduction section temperature was ranging from 950~1050 °C. The reduced briquettes were water quenched, ball mill ground and beneficated via low intensity magnetic separation. A magnetic concentrate, Ferronickel powder, with 86.9% TFe and 8.0% Ni was obtained, and the corresponding magnetic recovery of iron and nickel are 75% and 96.3%, respectively.
机译:镍生铁(NPI)可以代替电解镍,从而大大降低了不锈钢的生产成本。为了从含镍的红土矿中制备NPI,进行了煤基回转窑直接还原红土矿的中试规模试验,并在本研究中进行了报道。在此过程中,将与添加剂,粉煤和粘结剂混合的磨碎的红土样品(18.85%TFe和1.52%Ni)团块化成大小为40mm×40mm×31mm的团块,将红土矿石团块和还原性煤装入旋转炉中。直径为1.6 m,长度为16 m的窑,保留时间为6〜7小时,还原段温度为950〜1050°C。将还原的团块水淬,球磨机研磨,并通过低强度磁选进行选矿。获得具有86.9%TFe和8.0%Ni的磁性精矿,镍铁粉,铁和镍的相应磁性回收率分别为75%和96.3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号