Cheniere Sabine Pass Liquefied Natural Gas (SPLNG) Terminal is located 12 miles west of Johnson Bayou, Louisiana, on the Louisiana side of the Sabine Pass Channel. The construction of the Terminal will require the removal of approximately ±4.5 million cubic yards (CY) of mostly virgin soil from the proposed marine berth. The removal of the soil was conducted via a 36-inch hydraulic dredger. Due to the quantity of the dredged material, it is required under Louisiana regulations to utilize the dredged material for beneficial uses, and a decision was made to use the materials for beach nourishment alongthe shoreline east of Sabine Pass Jetty. The plan included pumping the dredged material south via dredge piping to Louisiana Point and then discharging the material into offshore waters about 2,200-feet (ft) from the Louisiana shoreline in depths ranging from 5 to 8 ft deep. The discharged material is expected to provide wave buffers, increased wildlife and aquatic habitat and act as a barrier to protect the existing shoreline from continued erosion. A two-dimensional hydrodynamic (RMA2) and sediment transport (SED2D) modeling effort was conducted to investigate the transport of the discharged material and its potential effects on the environment. Significant data collection effort, including bathymetric survey, geotechnical studies, current measurements, wind and tide data collection, and water quality sampling, was conducted to support the modeling effort. The bathymetric survey included a 3-mi by 2-mi (6-sq-mi) area surrounding the proposed beneficial use site and the East Jetty Boat Cut area to verify the relative elevation differences between the Boat Cut and the surrounding area. Available navigational charts were used to expand the RMA2 and SED2D models significantly beyond the field survey boundary to allow for sediment transport simulations of a larger area. The data were then used to develop a 2D mesh for RMA2 and SED2D models. The finished mesh has a total of 16,970 nodes and 5,559 elements. The modeling results were presented to federal and state agencies to support the application of necessary permits for the project. As a result, the project has been permitted and construction is ongoing. This paper provides a summary of the modeling effort and the status of the dredged materials placement effort.
机译:Cheniere Sabine Pass液化天然气(SPLNG)码头位于路易斯安那州Johnson Bayou以西12英里处,位于Sabine Pass通道的路易斯安那州一侧。航站楼的建设将需要从拟议的海上泊位中去除大约±450万立方码(CY)的大部分原生土壤。经由36英寸的液压挖泥机去除土壤。由于疏material物料的数量,根据路易斯安那州法规要求将疏material物料用于有益用途,并决定将这些物料用于沿岸养料 Sabine Pass码头以东的海岸线。该计划包括通过疏piping管道向南泵送疏south的物料到路易斯安那州角,然后将物料从路易斯安那州海岸线排放到约2,200英尺(英尺)的近海水深,深度为5到8英尺。预计排放的物质将提供波浪缓冲,增加的野生动植物和水生栖息地,并作为保护现有海岸线免受持续侵蚀的屏障。进行了二维流体动力学(RMA2)和沉积物迁移(SED2D)建模工作,以研究排放物质的迁移及其对环境的潜在影响。为了支持建模工作,进行了重要的数据收集工作,包括测深调查,岩土研究,当前测量,风和潮汐数据收集以及水质采样。水深测量包括拟议的有益使用地点周围的3英里乘2英里(6平方英里)的区域以及东码头划船区,以验证划船区与周围地区之间的相对海拔差异。使用可用的导航图将RMA2和SED2D模型大大扩展到了野外勘测边界之外,从而可以模拟更大面积的沉积物。然后将数据用于为RMA2和SED2D模型开发2D网格。最终的网格总共有16,970个节点和5,559个元素。建模结果已提交给联邦和州机构,以支持该项目所需许可证的申请。结果,该项目已获准并且正在进行中。本文概述了建模工作以及疏materials材料放置工作的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号