首页> 外文会议>IABSE symposium on tomorrow's megastructures >Experimental Study on Seismic Behaviour of Precast Piers with Combined Grouted Sleeve Splice and Grouted Central Tenon
【24h】

Experimental Study on Seismic Behaviour of Precast Piers with Combined Grouted Sleeve Splice and Grouted Central Tenon

机译:灌浆套筒接头与灌浆中央榫组合的预制墩抗震性能试验研究

获取原文

摘要

In precast bridge piers, longitudinal bars between prefabricated segments are usually connected by grouted sleeve splices (GS), while the concrete on the joint interface remains discontinuous. The structural behaviour distinction between the precast and cast-in-place piers becomes the main concern in seismic design. In order to improve the seismic performance of precast piers, a new type of intersegment connection with combined grouted sleeve splice and grouted central tenon (GS-GT) was proposed. The main objective of this study was to test, analyse, and evaluate this GS-GT connection for accelerated bridge construction. An experimental program was conducted with three bridge pier specimens, including a conventional cast-in-place (CIP) benchmark pier, a precast pier with GS, and a precast pier with GS-GT connections. All the three specimens had identical geometry except for the connection details. Their damage scenarios were observed during the cyclic loading tests, and some seismic indices were identified and analysed. Computational analysis using simulation models for GS-GT connections were established with the software OpenSees, which fit well with the experiment results. Research results indicated precast piers with GS-GT connections can achieve better displacement ductility, lateral force and hysteretic energy dissipation, compared with only GS connection. It was concluded that the GS-GT connection can enhance emulative effects, close to the conventional cast-in-place systems.
机译:在预制桥墩中,预制节段之间的纵向钢筋通常通过注浆的套管接头(GS)连接,而接头界面上的混凝土仍不连续。预制墩和现浇墩之间的结构性能差异成为抗震设计的主要关注点。为了提高预制墩的抗震性能,提出了一种新型的节段间连接,将灌浆的套管接头和灌浆的中心榫组合在一起(GS-GT)。这项研究的主要目的是测试,分析和评估这种GS-GT连接,以加快桥梁建设。对三个桥墩标本进行了实验程序,包括常规的现浇(CIP)基准墩,带GS的预制墩和带GS-GT连接的预制墩。除连接细节外,所有三个样品均具有相同的几何形状。在循环载荷试验中观察了它们的破坏情况,并确定和分析了一些地震指标。使用OpenSees软件建立了用于GS-GT连接的仿真模型的计算分析,该软件非常适合实验结果。研究结果表明,与仅GS连接相比,具有GS-GT连接的预制墩可以实现更好的位移延展性,侧向力和滞回能量耗散。得出的结论是,GS-GT连接可以增强润滑效果,与传统的现浇系统相近。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号