首页> 外文会议>Geo-China International Conference >Improvement of Off-Shore Immersed Tunnel Foundations in Soft Ground by Composite Foundation Methods
【24h】

Improvement of Off-Shore Immersed Tunnel Foundations in Soft Ground by Composite Foundation Methods

机译:复合地基法改善软土地基离岸沉管隧道地基

获取原文

摘要

The off-shore immersed tunnel is placed at a varying level and consequently has to accommodate complicated foundation condition. The segmental type of tunnel is sensitive to the differential longitudinal settlement. Therefore, a number of ground improvement methods are considered in order to provide an appropriate foundation for the type of immersed tunnel in soft ground. The composite foundation method is one of techniques which can reduce settlement, increase bearing capacity and slope stability. The composite foundation methods included sand compaction pile (SCP), cement deep mixing (CDM), and jet grouting pile, etc. Based on the Island and Tunnel Project of Hong Kong-Zhuhai-Macao Bridge in China and the Busan-Geoje Fixed Link Project in South Korea, this paper describes design and construction in soft ground by the SCP method mainly for off-shore immersed tunnel foundation.
机译:海上沉管隧道放置在不同的高度,因此必须适应复杂的地基条件。隧道的分段类型对纵向差异沉降敏感。因此,考虑了多种地面改良方法,以便为软土地基中的沉管隧道类型提供适当的基础。复合地基法是一种可以减少沉降,增加承载力和边坡稳定性的技术之一。复合地基方法包括压实桩(SCP),水泥深层搅拌(CDM)和旋喷桩等。基于中国香港-珠海-澳门大桥的海岛和隧道项目以及釜山-巨济固定连接,本文在韩国的一个项目中,介绍了SCP方法在软土地基上的设计和施工,主要是针对近海沉管隧道地基。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号