FLOOD INUNDATION MAPPING ALONG THE PROPOSED DIKE SYSTEM OF THE CAGAYAN DE ORO RIVER: THE SENDONG SCALE FLOOD

机译:拟议的卡加延德奥罗河堤防系统中的洪水泛滥:仙洞规模洪水

获取原文

摘要

In recent years, Cagayan de Oro has experienced the damaging impacts of flooding. In December 2011, Tropical Storm Sendong (Washi) caused the most devastating flood in the city's history which caused unparalleled damages and casualties. To mitigate the impacts of river flooding, the DPWH has instituted the Flood Risk Management Project - Cagayan de Oro River which proposes the construction of a 12-km dike system along the river. However, the dike system is designed for a Pablo scale flood which is estimated at 25-year return period, as compared to a Sendong scale flood which is approximated at 50-year return period. This study aims to determine the flood inundated area along the Cagayan de Oro River considering the proposed dike system under a Sendong scale flood. A high resolution Digital Terrain Model (DTM) derived from Light Detection and Ranging (LiDAR) data was used to extract the topography and river geometry along the channel with the use of HEC-GeoRAS. Flood profiles were then determined using a one-dimensional steady-state flow model through HEC-RAS. The model was calibrated and validated using the actual Pablo and Sendong flood maps. The hydraulic model was then used to simulate water-surface elevations and then combined with the DTM to obtain the spatial extent and flood depths. After running through 66 models, the final model is used to simulate the flood behavior with the proposed dike system. Results show that majority of the areas along the river are protected by the dike, thus conforming to the Pablo scale flood design. However, under a Sendong flood, results show that some areas along barangays Carmen, Balulang and Macasandig could be flooded, with a total area of approximately 37 hectares. It is recommended that concerned government agencies revisit and review the design details before full implementation to ensure a sustainable flood mitigation project.
机译:近年来,卡加延·德奥罗(Cagayan de Oro)遭受了洪水的破坏性影响。 2011年12月,仙台热带风暴(Washi)造成了该城市历史上最毁灭性的洪水,造成了无与伦比的破坏和人员伤亡。为了减轻河流洪水的影响,DPWH发起了洪水风险管理项目-卡加延德奥罗河(Cagayan de Oro River),该项目提议沿河修建12公里的堤防系统。但是,堤防系统是为帕布罗规模的洪灾而设计的,估计洪灾期为25年,而仙东规模的洪灾的洪灾程度约为50年。这项研究的目的是考虑到在仙洞规模洪水下的拟建堤防系统,确定卡加延德奥罗河沿岸的洪水泛滥区。使用HEC-GeoRAS,从光探测和测距(LiDAR)数据获得的高分辨率数字地形模型(DTM)用于提取沿河道的地形和河流几何形状。然后使用一维稳态流模型通过HEC-RAS确定洪水剖面。使用实际的Pablo和Sendong洪水图对模型进行了校准和验证。然后将水力模型用于模拟水面高程,然后与DTM结合以获得空间范围和洪水深度。在运行了66个模型之后,最终模型将用于通过提出的堤防系统模拟洪水行为。结果表明,沿河的大部分地区都受到堤防的保护,因此符合Pablo规模洪水的设计。但是,在Sendong洪水下,结果表明,可能会淹没Barangays Carmen,Balulang和Macasandig沿线的某些地区,总面积约为37公顷。建议相关政府机构在全面实施之前重新审查和审查设计细节,以确保可持续的防洪工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号