The new tunneling technology in soft ground called URUP (Ultra Rapid Underpass) was developed in an attempt toallow construction of a roadway underpass tunnel in a busy intersection where there is very limited work spaceavailable while being required to accelerate a construction schedule to minimize adverse impacts to the localenvironment. The URUP method enables a Tunnel Boring Machine (TBM) to launch and hole through directly fromground level safely while maintaining the ground stability from zero to ultra thin ground coverage and eliminates theneed for the large-scaled open cut excavation typically required for launching and receiving a TBM. This paperintroduces a new shield tunneling technology named URUP and discusses the experimental construction undertakenin the development process. The paper also provides project reports on three of the public projects that applied theURUP method.
机译:在软土地上开发的新隧道技术称为URUP(超快速地下通道),旨在 允许在工作空间非常有限的繁忙路口建造公路地下通道隧道 可用于加快施工进度,以最大程度地减少对当地的不利影响 环境。 URUP方法使隧道掘进机(TBM)可以直接从中发射并钻穿 安全地保持地面高度,同时保持地面稳定性(从零到超薄地面覆盖),并消除了 发射和接收TBM所需的大型明挖开挖需求。这篇报告 介绍了一种名为URUP的新型盾构隧道技术,并讨论了进行的实验施工 在开发过程中。该文件还提供了有关应用了以下内容的三个公共项目的项目报告: URUP方法。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号