首页> 外文会议>International Conference on Service Systems and Service Management >A two-machine flowshop with unavailability interval on the second machine
【24h】

A two-machine flowshop with unavailability interval on the second machine

机译:双机流量在第二台机器上具有不可用间隔

获取原文

摘要

The paper studies a two-machine flowshop with unavailability interval on the second machine. Contrary to most literature where machines are available at all times, this means that the machine may not always be available during the scheduling period, it needs a constant time to maintain the machine after completing a fixed number of jobs at most. The objective is to find the optimal job schedule such that the makespan is minimized. We focus on the relationship between the solution and the Johnson rule, and the performance of the Johnson rule as a heuristic when the job is resumable, analysis the worse-case performance ratio of the Johnson rule as a heuristic. Demonstrate the complexity of the problem when the job is nonresumable.
机译:本文在第二台机器上研究了双机流量,不可用间隔。与大多数文献相反,机器始终可用,这意味着在调度期间,机器可能并不总是可用,它需要在完成固定数量的作业后维护机器。目标是找到最佳工作计划,使得MakEspan被最小化。我们专注于解决方案与约翰逊规则之间的关系,以及约翰逊规则作为启发式工作,当工作恢复时,将约翰逊规则作为启发式的更糟糕的绩效比例分析。展示在不可挽回的工作时问题的复杂性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号