Japan's Spent Fuel Management Problems: Before and After Fukushima Accident

机译:日本的乏燃料管理问题:福岛事故之前和之后

获取原文

摘要

The operation of Rokkasho reprocessing plant has been postponed till 2012 for repeated serious technical problems. In total, 13,530 tons of spent nuclear fuel is stored in the 20,420 tons total capacity storage pools at the nuclear power plant sites as of September 2010. As 1,000 tons of spent nuclear fuel is generated annually, the storage pool will be filled up within about six years, and though there are several countermeasures being planned, such as re-racking, unless the storage problem is solved, eventually the operation of nuclear power plants would have to be stopped. Furthermore, spent fuel management has become even more complicated by the Fukushima accident. The possibility of introducing an on-site dry cask storage system has become questionable because of the Fukushima accident.
机译:由于反复出现严重的技术问题,六所庄后处理厂的运行已推迟至2012年。截至2010年9月,在核电厂厂区的20,420吨总容量存储池中总共存储了13,530吨乏核燃料。由于每年产生1,000吨乏核燃料,该存储池将在大约10天内被填满。六年之久,尽管计划了一些对策,例如重新竞赛,但除非解决了存储问题,否则最终将不得不停止核电厂的运行。此外,福岛事故使乏燃料管理变得更加复杂。由于福岛事故,引入现场干燥桶储存系统的可能性已成为疑问。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号