Rehabilitating a Critical Large Diameter Sewer Under a Levee and a Historic Park

机译:修复堤岸和历史公园下的关键大直径下水道

获取原文
获取原文并翻译 | 示例

摘要

This paper describes how the Washington Suburban Sanitary Commission (WSSC) supported the spiral-wound lining of its 102-inch Anacostia Trunk Sewer (ATS) by maximizing use of existing infrastructure to bypass up to 100 million gallons of wastewater per day. This paper also describes how WSSC structured the construction contracts for this work to maximize bidder interest while using a proprietary rehabilitation technology. Both of these topics will help other utilities learn how to make their own trenchless rehabilitation projects more affordable and technically feasible.The ATS is the largest, most critical pipe in the Washington Suburban Sanitary Commission (WSSC)’s collection system. WSSC directed rehabilitation of the ATS after a condition assessment identified significant hydrogen sulfide corrosion damage in the pipe and a structural evaluation determined that it was overstressed and at the end of its service life. The rehabilitation was constrained by the fact that approximately 1,700 linear feet of the ATS runs under a levee along the Anacostia River and under the historic Bladensburg Waterfront Park, site of the Battle of Bladensburg in the War of 1812.WSSC negotiated a price for the proprietary SPR rehabilitation and included it in the bidding documents to maximize the interest of general contractors who may have been concerned about being able to submit competitive bids. WSSC also procured the 96-inch gate valve, to be installed as part of the bypass system, ahead of the rest of the rehabilitation to ensure that it was ready when the rehabilitation contractor received its Notice to Proceed.
机译:本文介绍了华盛顿市郊区卫生委员会(WSSC)如何通过最大程度地利用现有基础设施来绕开每天多达1亿加仑的废水来支持其102英寸的Anacostia干线下水道(ATS)的螺旋伤口衬里。本文还描述了WSSC如何为这项工作制定施工合同,以在使用专有的修复技术的同时最大程度地提高投标人的兴趣。这两个主题都将帮助其他公用事业公司学习如何使他们自己的非开挖改造项目更实惠且在技术上可行。\ r \ nATS是华盛顿市郊区卫生委员会(WSSC)收集系统中最大,最关键的管道。在状态评估确定管道中严重的硫化氢腐蚀损坏,并且结构评估确定该管道过应力后,使用寿命终止后,WSSC指示对ATS进行修复。修复工作受到以下限制:ATS约1,700线性英尺沿着安纳科斯蒂亚河沿大堤行进,并在历史悠久的布拉登斯堡海滨公园(1812年战争中的布拉登斯堡战役遗址)下运行。\ r \ nWSSC议价进行SPR专有的修复,并将其包含在招标文件中,以使那些可能一直在关注能够提交具有竞争力的投标的总承包商的利益最大化。 WSSC还采购了96英寸闸阀,该阀将作为旁路系统的一部分安装在其余的修复工作之前,以确保在修复承包商收到其继续进行通知时,它已经准备就绪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号