首页> 外文会议>85th Annual GPA(Gas Processors Association) Convention 2006 vol.2 >Optimizing BP's Crane Gathering and Processing System
【24h】

Optimizing BP's Crane Gathering and Processing System

机译:优化BP的起重机聚集和处理系统

获取原文
获取原文并翻译 | 示例

摘要

BP America Production Company (BP) commissioned eSimulation~(SM)'s eSimOptimizer~(SM) web-based process optimization system on the Crane Gathering and Processing System in Upton and Midland Counties, TX, in February 2005. This technology has been applied previously by eSimulation to several gas processing facilities. Though the processing capacity at Crane is only 30 MMSCFD, smaller than any previous eSimulation optimizer application, BP chose the Crane Plant because it was well instrumented and staffed to support the project implementation. Although the initial project pay-rnout was projected to be small, it was still adequate for this pilot application. As the scope of the application was developed, BP and eSimulation identified a key tradeoff in coordinating delivery of unprocessed gas from the Midland compressor station to the Crane gas plant, approximately 20 miles away. BP's typical mode of operation was to bring as much gas from Midland to Crane as possible, rather than utilizing other processing options. BP and eSimulation agreed that expanding the optimizer system to manage the gathering and processing options was feasible and would increase the value of the application to BP. This application would become a first for the optimizer to extend the scope outside the plant fence. This paper will report how the eSimulation optimizer guided BP's plant operators to effectively process more gas at the Crane Plant. The resulting increase in residue gas and NGL production will be discussed.
机译:BP美国生产公司(BP)于2005年2月在德克萨斯州Upton和Midland县的起重机收集和处理系统上委托了eSimulation〜(SM)的eSimOptimizer〜(SM)基于Web的流程优化系统。该技术已得到应用以前通过eSimulation到多个气体处理设施。尽管Crane的处理能力只有30 MMSCFD,比以前的任何eSimulation优化器应用程序都要小,但BP之所以选择了Crane Plant,是因为它具备完善的工具和人员来支持项目的实施。尽管最初的项目支出预计很小,但对于该试点应用来说仍然足够。随着应用范围的发展,BP和eSimulation确定了协调未处理气体从Midland压缩机站到大约20英里外的Crane天然气厂的主要折衷方案。 BP的典型运营模式是将尽可能多的天然气从米德兰(Midland)输送到起重机(Crane),而不是利用其他处理选项。 BP和eSimulation一致认为,扩展优化器系统以管理收集和处理选项是可行的,并将为BP增加应用程序的价值。该应用程序将成为优化程序将范围扩展到工厂围墙之外的第一个应用程序。本文将报告eSimulation优化器如何指导BP的工厂操作员有效地处理起重机工厂的更多天然气。将讨论残留气体和NGL产量增加的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号