首页> 外文会议>4th International symposium on advanced topics in electrical engineering (ATEE 2004) >REGIMURI TRANZITORII INDUSE DE MANEVRELE DIN CIRCUITELEPRIMARE ?N SECUNDARELE TRANSFORMATOARELOR DEM?SURARE
【24h】

REGIMURI TRANZITORII INDUSE DE MANEVRELE DIN CIRCUITELEPRIMARE ?N SECUNDARELE TRANSFORMATOARELOR DEM?SURARE

机译:二次测量变压器中主要电路动作引起的过渡制度

获取原文
获取原文并翻译 | 示例

摘要

The paper present a study about the transient signal induced in secondary lines of measurementrntransformers by the opening and closing operations of breakers and disconnectors in the high voltage line ofrnpower stations. There are presented the tests made in three power stations with 400kV and 220kV highrnvoltage line using, for data acquisition, two 4-channel digital oscilloscopes (Tektronix TDS 420), connectedrnto PC by GPIB(IEEE 488) interface. The registered data are presented and commented in order to obtainrnconclusion about voltage stress of digital equipment connected in the secondary line of measurementrntransformers in order to choose the appropriate methods for its protection.
机译:本文对发电厂高压线路中断路器和隔离开关的分合闸操作,在互感器二次线路中引起的暂态信号进行了研究。提出了在三个具有400kV和220kV高压线路的电站中进行的测试,这些电站使用两个通过GPIB(IEEE 488)接口连接到PC的4通道数字示波器(Tektronix TDS 420)进行数据采集。呈现并注释已注册的数据,以便得出有关连接在测量变压器次级线路中的数字设备的电压应力的结论,以便选择适当的保护方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号