EVALUATION OF EARLY-AGE JOINT MOVEMENTS OF JPCP AT FIELD

机译:JPCP现场早期关节运动的评价

获取原文
获取原文并翻译 | 示例

摘要

Concrete pavement receives restrained stresses from early curing and which is restricted or is extended by external circumstance such as gradient of temperature and moisture. These behavior of JPCP(Jointed Plain Concrete Pavement) increase its binding power and tend to induce failure of joints, and which consider the mainly influence of early-age joint opening of concrete slab. In this research, the early-age joint movements and behavior of dowel-bar at JPCP were studied through field tests. The field tests were carried out for 5 days just after concrete placement, for 1 day after 52 and 1 day after 72 days on Chung-Ang Expressway new construction site in Dan-yang on the 28th and 29th of May 2001. The joint movements and dowel-bar behavior were measured by demec gauge, clip gauge, and strain gauge. The results could be summarized as follows; The tensile and compressive behavior of dowel bars for the first 3 days increased rapidly in early-age, and then decreased gradually after the first 3 days period. It was, also, found that dowel-bars behaved under the influence of temperature and moisture to which they were exposed. The joints movement variation with temperature changes as discovered in this research presented fairly good conformity with the prediction from Darter's formula. The results of regression analysis for the data measured during early 5 days showed that the joints of No.4, No.5, No.6, No.10, No.13, and No.15 could be considered as a moving joint. From data analysis on July 20, the joints of No.2, No.9, and No. 10 showed the significant correlations from the minus value of coefficient of regression, which usually present lower C-values. As a result of regression data on August 8, joint movements occurred at all joints. Joint freezing and closure could be judged from the regression analysis using joint opening and total temperature measured at field tests.
机译:混凝土路面受到早期养护的约束应力,并且受到外界条件(例如温度和湿度的梯度)的限制或扩展。 JPCP(结合式普通混凝土路面)的这些行为增加了其结合力并易于引起节理破坏,并且考虑了混凝土板的早期节理开口的主要影响。在这项研究中,通过现场测试研究了JPCP销钉杆的早期关节运动和行为。 2001年5月28日至29日,在丹阳市中昂高速公路新施工现场,混凝土浇筑后进行了5天的现场试验,52天之后的1天和72天之后的1天。用圆角规,夹规和应变仪测量销钉的性能。结果总结如下:销钉的前三天的拉伸和压缩行为在早期迅速增加,然后在前三天逐渐降低。还发现销钉在暴露于温度和湿度的影响下表现良好。在这项研究中发现,关节运动随温度变化的变化与Darter公式的预测非常吻合。对前5天测得的数据进行回归分析的结果表明,第4号,第5号,第6号,第10号,第13号和第15号的关节可被视为活动关节。根据7月20日的数据分析,2号,9号和10号节点之间的回归显示出与回归系数的负值具有显着相关性,而回归系数的负值通常呈现较低的C值。根据8月8日的回归数据,所有关节均发生关节运动。可以通过使用现场测试测量的接头打开和总温度从回归分析中判断接头的冻结和闭合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号