首页> 外文会议>The 3rd international symposium on modern mining amp; safety technology proceedings >Simulation Study on Deformation-Failure of Roof on Coal Mining Overlapping Face Using Discrete Element Method
【24h】

Simulation Study on Deformation-Failure of Roof on Coal Mining Overlapping Face Using Discrete Element Method

机译:基于离散元法的煤矿重叠工作面顶板变形破坏模拟研究

获取原文
获取原文并翻译 | 示例

摘要

The paper simulates to deformation-failure of roof on caving of overlapping face using discrete element method, and obtain basic data on the distribution features of stress on overburden rock and growth law of water flowing fractured zone while mining. The simulation shows that caving of overlapping could lead to obvious increase of the damage height of coal roof. And, the increased water flowing fractured zone could probably touch the aquifer. As a research result, we can guide the rpof water preventing work in coal mining.
机译:本文采用离散元法模拟了顶板崩落时顶板变形破坏的规律,获得了开采时覆岩应力分布特征和流裂带发育规律的基础数据。仿真结果表明,重叠崩落可明显提高煤顶的破坏高度。而且,增加的流动裂缝区域可能会接触含水层。作为研究结果,可以指导煤矿采煤防渗工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号