Continuous monitoring on 132kV line in reducing flashovers due to lightning

机译:连续监控132kV线路以减少雷电引起的闪络

获取原文
获取原文并翻译 | 示例

摘要

The Transmission Division of Tenaga Nasional Berhad (TNB), Malaysia manages and operates the 132kV, 275kV and 500kV transmission systems that form an integrated network known as the National Grid. TNB's National Grid system spans the whole of Peninsular Malaysia that represents the backbone of the electricity industry and the Transmission Division is responsible for the safe, adequate, reliable and economical operation of the grid system in conformance to the Malaysian Grid Code. Malaysia, being in the high region of lightning has caused the transmission lines to be exposed to severe lightning activities each year, thus being the main reason for overhead lines tripping each year. This includes the 132kV Kuala Krai to Gua Musang Line which is located in the North-East of Peninsular Malaysia. In 2012 , the Engineering Department of TNB Transmission was given the task to study the line performance. The main task is to explain the 'un-effectiveness' of the installed Transmission Line Arrester (TLA) on the line since 2007. The line was installed with more than 120 units of TLA since 2007 until 2012 . Theoretically, with increasing number of installed TLA will reduce the number of flashover on the line. However for this line, with increasing number of installed TLA, the flashover rate was recorded to be increased. The findings of the study will be presented in this paper. Furthermore, the continuous monitoring of the line will be presented together with the latest trip data for the line.
机译:马来西亚Tenaga Nasional Berhad(TNB)的输电事业部管理和运营132kV,275kV和500kV输电系统,这些输电系统形成了被称为国家电网的综合网络。 TNB的国家电网系统横跨代表电力行业骨干的整个马来西亚半岛,而输电部则负责按照马来西亚电网法规对电网系统进行安全,适当,可靠和经济的操作。马来西亚处在雷电高发地区,每年导致输电线路遭受严重的雷电袭击,因此,这是每年架空线路跳闸的主要原因。其中包括位于马来西亚半岛东北部的132kV瓜拉边疆区至瓜那桑线。 2012年,TNB传输工程部承担了研究线路性能的任务。主要任务是解释自2007年以来该线路上已安装的传输线避雷器(TLA)的“无效性”。从2007年到2012年,该线路安装了120多个TLA。从理论上讲,随着安装的TLA数量的增加,线路上的闪络次数将减少。但是,对于这条线,随着安装的TLA数量的增加,闪络率被记录为增加。该研究的结果将在本文中介绍。此外,还将显示对线路的持续监控以及该线路的最新行程数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号